Overview from the Sanitary Sewer Evaluation Survey (SSES) Report prepared for the Sanitary Board by Chapman Technical Group, March 2024.
- Ownership and permit. The collection system is owned and operated by the Sanitary Board under NPDES Water Pollution Control Permit No. WV0024708.
- Age. Most of the system was built before the mid-1960s. Portions were rehabilitated in the early 1990s, including lining the Venable Avenue interceptor and upgrading the lift stations.
- Size. About 40,820 feet of 4-inch to 15-inch gravity sewer, 5,900 feet of 6-inch to 8-inch force main, five lift stations, 160 manholes and 60 lamp holes. About 85% of the gravity sewer is vitrified clay pipe.
- Treatment. The Board does not operate a treatment plant. All sewage flows to Lift Station No. 1 and is pumped to the Town of Marmet Wastewater Treatment Plant, where a master meter measures the flow the Board pays to have treated.
- Customers. About 595 residential, 21 commercial and 2 public authority customers (per the Board’s PSC annual report for the year ending June 30, 2022).
- Inflow and infiltration. In 2023 the system averaged about 201,800 gallons per day, of which roughly 52% was estimated to be rain and groundwater entering the pipes (inflow and infiltration) rather than customer sewage.
- The survey. The SSES included flow monitoring, video inspection of 212 gravity sewer segments, smoke testing, and manhole inspections, to identify and prioritize repairs.
- Recommendations. The report recommends stopping known water-line leaks and roof-drain and storm connections, replacing all five lift stations (with emergency generators and without overflow pipes), and replacing or lining the most deteriorated sewer lines, in three phases.